- Administration Block
- Animal house
- Athletics Track
- Basket Ball Courts
- Boundary wall along Rudisho road
- Charter hall
- Complete Projects
- Construction of 6No. Gazebos
- Conversion of LC-06 to TVETI computer lab
- Conversion of LH-03 to Physics Laboratory
- Conversion of LH02 to Chemistry Laboratory
- Diagnostic Laboratory
- Eating Outlets near the Learning Centre
- Farm machinery shed
- Fish green house
- Furnishing of Tuition Block Auditoria Phase-4
- Gate and Sentry Houses at the Administration Block
- Guest house
- Herbarium
- Learning center
- Lecture Classrooms
- Murram road works
- Paving of Graduation Pavilion access road - Upgrading to paved standard
- Prof. George Magoha Library
- Proposed Auditorium and Lecture Classroom
- Proposed conversion of lecture halls at CLC into Media Studios
- Proposed Installation of 280 No. Executive Auditorium Seats In The Lower Level Auditorium
- Proposed Rudisho Road Boundary wall Phase 1 and 2
- Proposed Staff Center
- Proposed Students Entertainment Center
- Renovation of roof for micro-biology and computer laboratory 2
- Replacement of asbestos roofing sheets from nine University buildings
- Road works and Associated Drainage Works
- Service Platform for Admissions Office
- Sewer Line
- Supply, installation, testing and commissioning of 13KwP grid tied solar system at the office block and farm
- Supply, installation, testing and commissioning of 52KwP grid tied solar system new administration block
- Supply, installation, testing and commissioning of 52KwP grid tied solar system old administration block
- Tentatorium
- Tuition Block Sewer Line
- VIP car shade at the Main Administration Parking